Every installation is different. Some are relatively straightforward, some are more difficult. Our clients often have specific requirements regarding the types and location of the units, how they ‘blend in’ with their surroundings and often their aesthetic appearance. Often there are local planning restrictions or building infrastructure problems to be overcome.

Our surveyors will discuss the client’s requirements and finally specify the equipment and how the installation will be carried out. There follows a few typical case studies outlining the clients requirements and how we dealt with their installation.


Walthamstow Academy

Walthamstow Academy

When Walthamstow Academy recognised their need for an integrated air conditioning solution for their flagship school, they turned to a company with a solid track record of successful installations; a company that had the right level of technical ability, the outstanding project management skills and the capability to respond quickly and efficiently to customer requirements whilst being sufficiently flexible to adapt to changes in requirements.

To provide the most efficient method of cooling mixed-use rooms including offices, classrooms, laboratories and IT Suites over three floors and a 12,000 square feet footprint.

More Info


Decoratum

Decoratum Gallery

The brief was to install a complete air conditioning system within a very prestigious basement gallery in a three-storey building in Central London to provide comfort cooling and heating. In this particular instance, the external condenser units were to be roof-mounted.

The gallery is divided into distinct and ‘themed‘areas and comprises of furnishings, lighting, objet d’art and paintings. Therefore, a very important part of the brief was to keep wall space available for potential display.

More Info


Inland Revenue at Somerset House

Inland Revenue at Somerset House

Air Conditioning Company was contacted by the Inland Revenue at Somerset House in Central London in order to deal with a cooling challenge in their Kingsway offices.

The manager in charge of Enforcement had identified that the staff in the Kingsway offices were getting “very hot under the collar” because they were unable to locate the main controls for their central heating system for the building. The difficulty was that no-one could find the correct controls to actually switch the heaters completely off!

More Info


The Summit

The Summit Health Centre

The Air Conditioning Company was brought in to design a complete air conditioning installation at The Summit, Centre for Conventional & Complimentary Health in Highgate Village, using top of the range ceiling and wall mounted units, appropriate to the extremely high specification finish required in all areas of a major refurbishment taking place at The Summit.

The Summit is a period building in the Highgate conservation area and therefore presented a number of problems for The Air Conditioning Company.